← Back to Dashboard

HCAI Healthcare: Scripps Memorial Hospital - La Jolla — La Jolla, San Diego County

📍 San Diego SoCal
9/10
Action Required
Scripps Health is a known prefab-friendly owner. Tower III is a major new hospital tower in proposed status with no GC selected — this is the ideal time to engage. Contact Scripps Health Capital Projects team to position ConXtech for structural steel on Tower III. Also research architect of record for early design influence. Monitor HCAI for permit progression.
Why This Matters

Scripps Memorial Hospital La Jolla is planning a new Tower III — a major hospital tower — plus staff connector and pedestrian tunnel, all in Proposed status. Scripps Health is on ConXtech's known prefab-friendly owner list, and no GC has been selected yet, giving ConXtech the opportunity to influence the structural system selection. San Diego is a high-seismic target metro, making the proprietary SMF system a strong value proposition.

ConXtech System
🟢 Proprietary System
Project Type
healthcare
Project Stage
Planning
Stories
Estimated Size
150,000-300,000 sqft (Tower III + connector + tunnel)
Total Project Value
$400M-$700M
Estimated Steel Scope
$5M-$15M
Timeline Fit
OSHPD 1-Proposed with a 2026 CAP ID — this is in early planning/design now, likely heading to construction 2027-2028. GC selection and steel procurement could align with late 2026 award for Tower III and connector structures.
Fit Assessment
strong fit
General Contractor
No GC Selected
Owner
Scripps Health Prefab-Friendly
Key Contacts
[object Object]
Lead Status
Team Notes