📍 San Bernardino healthcare Proprietary under_construction HCAI Healthcare
Stories: 3
Size: 30,000-60,000 sqft
Value: $30M-$60M
Scope: Already awarded
Timeline: Under Construction — the 3-story O.B. Addition has already been awarded and is being built. Limited opportunity for this phase.
→ 3-story healthcare addition under construction — research the GC and steel fabricator. Good profile for ConXtech's system (3-story, healthcare, CA seismic) but this phase is already awarded. Track for future phases and use as a comp for similar hospital additions.
📍 Oakland healthcare Proprietary planning 🔴 No GC SelectedHCAI Healthcare
Size: 200,000-400,000 sqft
Value: $500M-$1B
Scope: $8M-$20M
Timeline: New Hospital Building is OSHPD 1-Proposed while site support infrastructure is under construction — suggests the main hospital building is in design/planning with construction potentially starting 2026-2027. Strong timeline alignment for structural steel pursuit.
→ Major new hospital building in Oakland with no GC selected — this is a flagship Bay Area healthcare project. UCSF is a UC system entity (ConXtech has UC portfolio). Engage UCSF Facilities and Capital Programs immediately. Research architect of record and track GC selection. Site support buildings already under construction signals the main building is imminent. Target DPR, Swinerton, Hensel Phelps, or McCarthy as likely GC bidders.
A brand-new children's hospital building in Oakland is one of the largest healthcare projects in the Bay Area pipeline. With site support infrastructure already under construction and the main hospital building still in Proposed status, ConXtech has a window to influence structural system selection. UCSF is part of the University of California system, where ConXtech has existing relationships, and the Bay Area high-seismic zone is ideal for the proprietary SMF system.
📍 San Jose healthcare Proprietary planning 🔴 No GC SelectedHCAI Healthcare
Size: 200,000-400,000 sqft (new main hospital)
Value: $500M-$1B+
Scope: $8M-$20M+
Timeline: New Main Hospital is OSHPD 1-Proposed — likely in design/permitting now, steel procurement could align with 2026-2027 assembly for early phases
→ Major new hospital construction in San Jose — no GC selected yet. This is a ground-up main hospital replacement, one of the largest healthcare projects in the Bay Area pipeline. Engage HCA Healthcare facilities planning team immediately. Identify the architect of record and reach out. Position ConXtech for central plant, MOB, or support building steel packages even if the main tower exceeds 6 stories. Track for GC selection — DPR, McCarthy, Swinerton all likely bidders.
A brand-new main hospital building in San Jose is one of the most significant healthcare construction projects in the Bay Area pipeline. No GC is selected yet, giving ConXtech a window to influence the structural system choice. Even if the main tower exceeds 6 stories, the central plant, tunnel, canopy, and potential associated MOB structures are strong fits for ConXtech's proprietary system.
Timeline: East Wing Hospital Addition is OSHPD 1-Proposed, suggesting it is in planning/design. Support structures (tanks, generators) are already under construction, indicating the campus expansion is actively moving forward. Addition could be awarding structural steel in late 2026.
→ Stanford Health Care is a known prefab-friendly owner and ConXtech relationship. The East Wing Hospital Addition is a real structural steel opportunity — a new hospital wing, not just utility infrastructure. Contact Stanford Health Care Facilities Planning immediately to understand scope, timeline, and GC selection process. Monitor HCAI for updated building details (stories, sqft). Also engage DPR Construction and Rudolph and Sletten — both are ★ Known Partners who frequently work with Stanford Health Care.
This is the standout lead in this batch. Stanford Health Care is a known prefab-friendly owner, the East Wing Hospital Addition represents real structural steel scope (unlike the utility-only permits in most other items), and it's in the Bay Area — ConXtech's home turf. The 'Proposed' status on the addition means ConXtech can still influence the structural system selection. Support infrastructure already under construction signals the project is funded and moving.
📍 San Diego healthcare Proprietary planning 🔴 No GC Selected★ Scripps HealthHCAI Healthcare
Size: 150,000-300,000 sqft (Tower III + connector + tunnel)
Value: $400M-$700M
Scope: $5M-$15M
Timeline: OSHPD 1-Proposed with a 2026 CAP ID — this is in early planning/design now, likely heading to construction 2027-2028. GC selection and steel procurement could align with late 2026 award for Tower III and connector structures.
→ Scripps Health is a known prefab-friendly owner. Tower III is a major new hospital tower in proposed status with no GC selected — this is the ideal time to engage. Contact Scripps Health Capital Projects team to position ConXtech for structural steel on Tower III. Also research architect of record for early design influence. Monitor HCAI for permit progression.
Scripps Memorial Hospital La Jolla is planning a new Tower III — a major hospital tower — plus staff connector and pedestrian tunnel, all in Proposed status. Scripps Health is on ConXtech's known prefab-friendly owner list, and no GC has been selected yet, giving ConXtech the opportunity to influence the structural system selection. San Diego is a high-seismic target metro, making the proprietary SMF system a strong value proposition.
📍 San Jose healthcare Proprietary under_construction 🔴 No GC SelectedHCAI Healthcare
Stories: 4
Size: 100,000+ sqft (multi-building campus expansion including ED additions and 4-story stair tower)
Value: $200M-$400M (estimated, major county hospital campus expansion)
Scope: $3M-$8M (depending on remaining phases)
Timeline: Multiple buildings under construction, but proposed components (WWT-06, MRI Trailer Awning) may still need steel subcontractor engagement. Mixed timeline — some work already awarded, future phases may be available.
→ Major Bay Area healthcare campus expansion with proposed components still in pipeline. Research the GC on the active phases — if it's a known partner, engage about remaining proposed scope. The BHSC Building and Link Building under construction suggest a multi-phase campus build. Contact Santa Clara County Health & Hospital System facilities team about upcoming phases and proposed buildings.
This is a major county hospital campus expansion in San Jose with multiple buildings at various stages. The 4-story stair tower and ED additions are strong proprietary system candidates. Proposed components indicate future steel work may still be available for bid in the target metro.
📍 San Jose healthcare planning 🔴 No GC Selected★ Stanford Health CareHCAI Healthcare
Stories: 1
Size: Unknown — utility/infrastructure scope
Value: $50M-$150M (campus expansion phase)
Scope: $1.5M-$4M (utility structures and nursing pods)
Timeline: 2026 HCAI application with Proposed water/wastewater tanks and nursing pods under construction — infrastructure components could procure steel in 2026
→ Stanford Health Care is a known prefab-friendly owner. This 2026 HCAI filing shows active campus expansion with proposed utility structures and nursing pods under construction. Contact Stanford Health Care Facilities Planning — ConXtech has a relationship with Stanford. Identify if DPR or Swinerton is managing the current nursing pod construction. This may signal a larger campus expansion with additional buildings coming.
Stanford Health Care is on ConXtech's known prefab-friendly owner list, and this fresh 2026 HCAI filing confirms active campus infrastructure expansion. While the current proposed elements are utility structures, the nursing pod construction signals broader campus growth that may include mid-rise clinical or MOB buildings — where ConXtech's proprietary system excels.
📍 San Bernardino healthcare planning 🔴 No GC Selected★ Kaiser Foundation Hospital - FontanaHCAI Healthcare
Value: Unknown — infrastructure scope, likely part of larger campus investment
Scope: Unclear — current scope is utility tanks/infrastructure; potential for broader campus build
Timeline: OSHPD 1-Proposed status — early in HCAI review. Infrastructure/utility scope (tanks) suggests campus investment, but may be limited structural steel in these specific buildings. Monitor for larger building phases.
→ Kaiser Permanente project — ConXtech has delivered 20+ Kaiser MOBs. Even though this filing shows utility infrastructure (tanks), it signals active Kaiser campus investment at Fontana. Contact Kaiser Facilities Planning for Southern California immediately to understand full campus master plan and whether additional clinical or MOB buildings are planned. Utility infrastructure often precedes major building phases.
Any Kaiser Permanente project is top priority — ConXtech is the anchor structural steel partner for Kaiser. While this specific filing covers utility tanks, campus infrastructure investment at Fontana strongly signals a broader building program. ConXtech should proactively engage Kaiser SoCal Facilities to position for any upcoming clinical or MOB buildings.
Timeline: OSHPD 1-Proposed — early HCAI review stage. Given HCAI review timelines, construction could begin late 2026 or 2027. Steel award potentially Q1-Q2 2027.
→ Healthcare wing/corridor construction in CA with no GC selected — strong early signal. Contact San Antonio Regional Hospital Facilities department to understand scope of West Wing Corridor project. Identify architect of record and track for GC selection. Hospital additions in high-seismic SoCal are ideal for ConXtech's SMF system.
📍 Sacramento healthcare under_construction ★ University of California Davis Medical CenterHCAI Healthcare
Stories: 2
Size: Unknown for remaining scope; California Tower is the major building
Value: $500M+ (overall campus project)
Scope: $500K-$2M (remaining canopy/CUP scope); California Tower already awarded
Timeline: California Tower is under construction — the main opportunity has passed. However, Interim Ambulance Canopy and Drop-off Canopy are at Proposed status, and there may be future phases. UC Davis is a known prefab-friendly owner.
→ California Tower is under construction — research who the GC is (likely a known partner). The Proposed canopy elements are small scope but maintain relationship with UC Davis facilities planning for future phases. UC is a prefab-friendly owner with ConXtech portfolio history (Merced, SJSU). Track for future buildings in the medical center expansion.
UC Davis is a prefab-friendly owner in ConXtech's university portfolio. While the main tower is already under construction, this is a major campus expansion that will likely have future phases. Maintaining the relationship and understanding the GC team is valuable for future work.
📍 San Diego healthcare Proprietary planning 🔴 No GC Selected★ Scripps HealthHCAI Healthcare
Size: 150,000-300,000 sqft (Tower III + connectors + tunnel + loading dock — major hospital expansion)
Value: $400M-$700M
Scope: $5M-$15M
Timeline: Proposed status — HCAI review in progress, likely awarding structural packages in late 2026 or early 2027. Tower III is a significant new building. Good timeline alignment for ConXtech engagement now.
→ Scripps Health is a known prefab-friendly owner. Tower III is a major new hospital tower — engage Scripps Facilities Planning immediately about structural steel package. Research architect of record. Monitor HCAI for plan approval milestones. Target known GC partners active in San Diego: McCarthy, Hensel Phelps, RQ Construction, Sundt.
Scripps Health is on ConXtech's known prefab-friendly owner list. Tower III represents a major new hospital tower with substantial structural steel scope, plus multiple connector buildings that could use ConXtech's system. Project is in Proposed status with no GC selected — ideal timing for early engagement on the structural system.
Value: $80M-$200M (total campus expansion including utilities and East Wing)
Scope: $2M-$6M (for the East Wing Hospital Addition only — the tank/utility permits listed here are not steel building scope)
Timeline: East Wing Hospital Addition is listed as OSHPD 1-Proposed, meaning the main building expansion has not yet started construction. Utility structures are under construction, suggesting the main building phase could award in 2026 for assembly 2026-2027. Good timeline alignment for the addition.
→ The East Wing Hospital Addition is still 'Proposed' — this is the real opportunity, not the tank permits. Stanford Health Care is a known prefab-friendly owner. Research the East Wing Addition scope, architect of record, and whether a GC has been selected for the building phase. Contact Stanford Health Care Facilities Planning about structural steel for the East Wing. Check if DPR or Rudolph and Sletten (★ Known Partners with Stanford history) are involved.
Stanford Health Care is a known prefab-friendly owner with an active hospital addition ('East Wing') still in Proposed status in the Bay Area — ConXtech's home market. The utility infrastructure is already under construction, which means the main building phase is imminent. This is the highest-value lead in this batch because it involves an actual building addition, not just tanks.
📍 San Jose healthcare Proprietary under_construction 🔴 No GC SelectedHCAI Healthcare
Stories: 4
Size: 100,000-250,000 sqft
Value: $300M-$600M
Scope: $5M-$15M
Timeline: Massive multi-building hospital campus expansion. Link Building (4 stories) and multiple ED additions are under construction while additional infrastructure is Proposed. The scale and multi-phase nature means ongoing steel opportunities through 2026-2027.
→ Large multi-building hospital campus expansion in San Jose with a 4-story Link Building and BHSC Building. The 4-story mid-rise is ideal for ConXtech's proprietary system. Research the GC(s) on the under-construction phases — likely a known ConXtech partner given Bay Area healthcare scale. Identify if there are remaining structural steel packages or future phases. County-owned facility — check Santa Clara County procurement for upcoming bids.
This is one of the largest hospital expansion programs in the Bay Area with a 4-story Link Building, BHSC Building, and multiple ED additions. The 4-story mid-rise profile is ideal for ConXtech's proprietary system in a high-seismic zone. Multiple building phases means potential for repeat engagement on structural steel packages.
📍 San Bernardino healthcare Proprietary planning 🔴 No GC SelectedHCAI Healthcare
Size: 50,000-150,000 sqft (replacement building is a substantial scope)
Value: $80M-$200M
Scope: $3M-$10M
Timeline: Proposed status with Phase 3 Replacement Building — likely in early design, targeting award in 2026-2027. Good alignment for ConXtech's current pipeline needs.
→ Phase 3 Replacement Building is a significant new construction healthcare project with no GC selected. Contact Redlands Community Hospital facilities planning to understand scope and timeline. Research the architect and MEP team. Engage known GC partners who work in the Inland Empire — Tilden Coil, Bernards Builders, C.W. Driver are all active in this region.
A hospital replacement building is exactly the type of multi-story healthcare new construction that fits ConXtech's proprietary system. At Proposed status with no GC selected, there is a strong opportunity to engage early and position the rapid-assembly system for schedule advantage on a seismic-zone hospital.
📍 San Bernardino healthcare planning 🔴 No GC Selected★ Kaiser Foundation Hospital - FontanaHCAI Healthcare
Value: $5M-$15M (current tank scope); could be $200M+ if this is precursor to larger hospital project
Scope: Minimal for tanks/infrastructure; potential for larger scope if clinical buildings are added
Timeline: Proposed status — but the listed buildings are only utility infrastructure: water tanks and wastewater tanks. This does not appear to include a main building or clinical structure yet.
→ KAISER PERMANENTE anchor client — but current scope is limited to water tanks and wastewater tanks (site infrastructure). This could be a precursor to a larger hospital expansion or replacement project. Contact Kaiser Facilities Planning in Southern California immediately to understand the full campus master plan for Fontana. Water/wastewater infrastructure often signals a larger building project is coming. ConXtech has delivered 20+ Kaiser MOBs — leverage that track record.
Any Kaiser project deserves attention given ConXtech's anchor client relationship. While the current HCAI filing only shows utility tanks, infrastructure work at a Kaiser campus often precedes a major building project. This warrants immediate outreach to Kaiser's SoCal facilities team to understand the bigger picture.
📍 San Diego healthcare Proprietary planning 🔴 No GC SelectedHCAI Healthcare
Stories: 3
Size: 40,000-80,000 sqft (3-story behavioral health building)
Value: $80M-$150M (MBH building + campus work)
Scope: $2M-$5M
Timeline: Proposed 3-story Mental and Behavioral Health Building filed 2025 — likely awarding in 2026-2027. OSHPD 5 classification for the MBH building may expedite permitting.
→ The proposed 3-story Mental and Behavioral Health Building is an ideal ConXtech proprietary system candidate — mid-rise, healthcare, high-seismic zone, OSHPD 5 (faster approval path). No GC selected for this phase. Research Rady Children's facilities planning team and architect of record. Note: the ICU/ES Pavilion is already under construction — identify the GC on that phase as they may be favored for the MBH building.
The proposed 3-story Mental and Behavioral Health Building is a textbook ConXtech proprietary system project — mid-rise, healthcare, San Diego (high-seismic), and likely repetitive floor plans for patient rooms. OSHPD 5 classification suggests a less acute care standard which may accelerate permitting. The GC delivering the currently under-construction ICU Pavilion is worth identifying as they may be the incumbent for this next phase.
📍 Riverside healthcare Proprietary under_construction ★ Kaiser Foundation Hospital - RiversideHCAI Healthcare
Value: $400M–$900M (major replacement hospital with bed tower, speculative)
Scope: N/A — already under construction
Timeline: Under Construction — filed 2021. This is a major Kaiser campus project (bed tower, rotunda, tech dock) but it is well into construction. Steel is long since erected.
→ Kaiser Riverside is under construction — too late for primary steel. However, research if there are future phases or adjacent MOB/clinic buildings planned on this campus. Kaiser campus expansions often come in waves. Contact Kaiser Facilities Planning for Riverside campus master plan.
Scope: $1.5M-$4M (for ED Expansion building only — tanks are not ConXtech scope)
Timeline: Already under construction status. The ED Expansion is listed as under construction, which means the GC and structural sub are likely already selected. However, verify whether the ED Expansion structural package has fully been awarded or if only site/utility work has started.
→ Kaiser Permanente anchor client — but the ED Expansion is listed as 'Under Construction.' Immediately verify whether the structural steel package for the ED Expansion has been awarded. If structural work hasn't started, there may still be an opportunity. Contact Kaiser Facilities Planning SoCal region. Even if this phase is locked, track for future phases at Baldwin Park. Also ask Kaiser contacts about other SoCal campus expansions coming in 2026-2027.
📍 Oakland healthcare Proprietary planning 🔴 No GC Selected
Size: 50,000-150,000 sqft (expansion building)
Value: $80M-$200M
Scope: $3M-$10M
Timeline: Proposed status — likely in planning/design phase now, could award in late 2026 or early 2027. Good alignment with ConXtech's target window.
→ Hospital expansion building in Fremont — just miles from ConXtech's Hayward HQ. No GC selected. Engage Washington Hospital facilities planning team immediately. Track for GC shortlisting. Reach out to known partners (Swinerton, DPR, Hensel Phelps) who may be positioning for this project.
A proposed hospital expansion building in Fremont — essentially ConXtech's backyard. The proposed status means the structural steel approach is still open, and no GC has been selected. The underground service passage component suggests significant new construction scope. Early engagement here could lock in the proprietary system.
📍 Los Angeles healthcare planning 🔴 No GC Selected★ Kaiser PermanenteHCAI Healthcare
Stories: 1
Size: Unknown — utility infrastructure and canopy suggest modest building scope
Value: $20M-$50M
Scope: $500K-$2M (canopy + utility structures only; flag for future building phases)
Timeline: Mixed status — some buildings Proposed, MRI 2 already Under Construction. The Proposed components (canopy, wastewater/water tanks) are infrastructure/utility scope, not building structures. However, Kaiser projects often have phased expansions — this signals active campus investment.
→ Kaiser Permanente anchor client — ConXtech has delivered 20+ Kaiser MOBs. Current scope is utility infrastructure and canopy (limited steel), but active campus investment signals future building phases. Contact Kaiser Facilities Planning for West LA campus master plan. Ask about upcoming MOB, clinic, or patient tower phases. Leverage existing Kaiser relationship to stay ahead of future RFPs.
Kaiser Permanente is ConXtech's anchor client. While the current scope (tanks, canopy, MRI) has limited structural steel opportunity, active HCAI filings signal ongoing campus investment. This is a relationship-maintenance touchpoint — engage Kaiser Facilities to learn about upcoming building phases at West LA that could be a strong proprietary system fit.
Scope: Unknown — current scope is tanks/utility; monitor for building expansion
Timeline: Mixed status — some components under construction, but fuel/water/wastewater tanks suggest ongoing campus investment. Monitor for new building phases.
→ Kaiser Fremont is in ConXtech's home turf (Alameda County, minutes from Hayward HQ). Utility tank construction signals active campus investment. Contact Kaiser Facilities Planning to identify any upcoming building phases — MOB, clinic, or patient tower additions. Leverage proximity and anchor client relationship.
Kaiser Fremont is literally in ConXtech's backyard. Active utility infrastructure work signals ongoing campus investment. Any building expansion would be an ideal proprietary system project — high seismic zone, anchor client, local to fabrication and erection teams.
📍 Los Angeles healthcare Proprietary planning 🔴 No GC SelectedHCAI Healthcare
Size: 150,000-300,000 sqft (replacement hospital)
Value: $300M-$600M
Scope: $5M-$15M
Timeline: Proposed status — likely 12-24 months from construction start, aligns with late 2026/2027 steel needs depending on design timeline
→ Replacement Hospital is the key scope — this is a ground-up hospital replacement in CA with no GC selected. Engage Antelope Valley Medical Center facilities planning team immediately. Research architect of record. Position ConXtech for structural steel package before GC selection. Monitor HCAI for design review milestones.
A full replacement hospital in Los Angeles County is a major ground-up healthcare project with significant structural steel scope. With 'Proposed' status and no GC selected, ConXtech has the opportunity to influence the structural system decision early. The high-seismic location in California makes ConXtech's SMF solution a strong value proposition.
📍 Fresno healthcare Proprietary under_construction ★ Kaiser PermanenteHCAI Healthcare
Stories: 1
Value: Unknown — ED expansions at Kaiser hospitals typically range $30M-$100M+
Scope: Unknown — utility structures listed are below threshold, but ED Expansion could represent meaningful steel scope if multi-story
Timeline: Under construction — the utility infrastructure is active, but the Emergency Department Expansion component signals a larger structural project that may be in progress or upcoming
→ Kaiser Fresno ED Expansion is under construction — research the GC on this project immediately. If ConXtech isn't already involved, the ship may have sailed on the main structure, but look for future phases. Contact Kaiser Facilities Planning to understand full campus plan. Check if the ED Expansion is a multi-story addition with meaningful steel frame.
Timeline: OSHPD 1-Proposed for supporting infrastructure (tanks, canopy). These are ancillary structures to the main hospital, not primary building construction. Timeline is near-term but scope is limited.
→ Kaiser is ConXtech's anchor client — maintain relationship visibility on this project even though current scope (tanks, canopy) is below typical steel threshold. Use this as a touchpoint with Kaiser West LA facilities team to learn about upcoming larger capital projects (MOB expansions, clinic builds). Check Kaiser's capital plan for West LA campus.
📍 Orange County healthcare planning 🔴 No GC Selected★ Kaiser PermanenteHCAI Healthcare
Value: Unknown — utility infrastructure only in this filing
Scope: Unknown — current filing is tanks only; the volume of tanks suggests a larger project may exist
Timeline: OSHPD 1-Proposed with 2025 application. Multiple tanks (2 water, 2 wastewater, 1 fuel) suggest significant utility infrastructure — could be supporting a new or expanded building. Irvine/Orange County is a target metro.
→ Kaiser Permanente anchor client — five utility tank permits at the Irvine campus is an unusually high volume, suggesting a significant campus expansion. Contact Kaiser Facilities Planning to inquire about new building construction at the Orange County-Irvine campus. ConXtech has delivered 20+ Kaiser MOBs. Monitor HCAI for building permits at this site.
📍 San Bernardino healthcare planning 🔴 No GC SelectedHCAI Healthcare
Stories: 1
Size: Unknown — replacement building scope unclear but likely significant
Value: Unknown — Phase 3 replacement building likely $30M-$80M+
Scope: $1.5M-$5M (dependent on replacement building size)
Timeline: OSHPD 1-Proposed — early in HCAI review. 'Phase 3 Replacement Building' suggests a significant new building within a phased campus program. Steel award likely late 2026 or 2027.
→ Phase 3 Replacement Building is the key scope element — this is a major healthcare construction project. Contact Redlands Community Hospital Facilities Planning to understand building size, stories, and structural system. Track for GC selection. The 1-story ancillary buildings (pump house, water tank) suggest campus infrastructure, but the replacement building is the opportunity.
📍 San Diego healthcare Proprietary planning 🔴 No GC SelectedHCAI Healthcare
Size: 150,000-400,000 sqft (New Tower + support)
Value: $300M-$600M (campus total)
Scope: $5M-$15M (New Tower phase)
Timeline: Mixed status — most buildings under construction but New Tower and Electrical Yard are OSHPD 1-Proposed. The proposed tower could be a future phase heading into procurement in 2026-2027.
→ The New Tower at Sharp Memorial is in Proposed status — this is the actionable component. Research: (1) How many stories is the New Tower? If 2-6 stories, it's ideal for proprietary system. (2) Who is the GC on the under-construction phases? If it's a known partner (e.g., McCarthy, Turner), leverage that relationship for the New Tower phase. (3) Contact Sharp HealthCare Capital Projects about the New Tower timeline and structural system.
Sharp Memorial Hospital's campus expansion includes a New Tower in Proposed status — a future phase that ConXtech can still pursue. The existing under-construction phases provide an opportunity to identify the incumbent GC and build relationships. San Diego's high-seismic requirements make ConXtech's SMF system particularly valuable.
📍 San Jose healthcare under_construction ★ Stanford Health CareHCAI Healthcare
Stories: 1
Value: $50M+ (campus infrastructure component)
Scope: $500K-$1.5M (utility structures only — below threshold)
Timeline: Main buildings under construction (permit from 2019). Proposed water/wastewater tank components are utility infrastructure, not building structures. Limited near-term steel opportunity.
→ Stanford Health Care is a known prefab-friendly owner in the Bay Area. The current scope (nursing pods, water tanks) is infrastructure/utility — likely below ConXtech's steel threshold. However, use this as relationship intelligence. Monitor Stanford Health Care capital plans for new building construction. Research whether DPR or another known partner is the GC on the broader campus project.
📍 Los Angeles healthcare Proprietary under_construction ★ Kaiser Foundation Hospital - Baldwin ParkHCAI Healthcare
Size: 30,000-80,000 sqft (ED expansion)
Value: $80M-$200M
Scope: $2M-$6M
Timeline: Status is Under Construction. The ED Expansion and supporting infrastructure are already in the field. Limited opportunity for the primary structural package, but future phases or supplemental steel work may exist.
→ Kaiser Permanente anchor client — project is under construction, but research the GC (likely DPR or McCarthy). Identify if there are future phases at Baldwin Park. Use this as intel to stay in front of Kaiser SoCal Facilities for upcoming projects. Check Kaiser's capital plan for additional Baldwin Park campus expansions.
Kaiser Permanente is ConXtech's anchor client with 20+ MOBs delivered. While this ED Expansion is already under construction, identifying the GC and tracking future phases at this campus is critical for maintaining the Kaiser relationship. Any follow-on work at Baldwin Park should be pursued aggressively.
📍 Los Angeles healthcare Proprietary planning 🔴 No GC SelectedHCAI Healthcare
Size: 150,000-350,000 sqft (replacement hospital)
Value: $400M-$800M
Scope: $5M-$15M
Timeline: Proposed status with a full replacement hospital — likely in early design. Steel award could fall in late 2026 or 2027 depending on pace.
→ Replacement hospital project — this is a full new hospital build, not just utility work. Contact Antelope Valley Medical Center facilities planning to understand scope, timeline, and GC selection process. A replacement hospital of this scale will require significant structural steel. Identify architect of record and monitor for RFQ/RFP from GCs.
A full replacement hospital is the largest scope item in this batch — this is a ground-up hospital, not just utility infrastructure. The 'Replacement Hospital' building listed as proposed alongside utility structures indicates a major campus rebuild. No GC is selected yet, giving ConXtech time to position with both the owner and prospective GCs.
HCAI Healthcare — State TrackedSan Diego healthcare Proprietary planning
3-story Mental and Behavioral Health Building is an ideal ConXtech proprietary system fit — mid-rise healthcare, likely repetitive floor plans. No GC identified for the MBH building yet. Contact Rady Children's Facilities Planning. Research which GC is handling the campus connector and ICU/ES Pavilion (already under construction) — they may have an inside track on the MBH phase. Target known partners: McCarthy, DPR, Turner in San Diego.
The 3-story Mental and Behavioral Health Building is a textbook ConXtech proprietary system project — mid-rise, healthcare, high-seismic zone, likely repetitive floor plans. Multiple campus components already under construction indicate strong institutional commitment and budget availability. The 'Proposed' MBH phase represents a real near-term opportunity.
HCAI Healthcare — State TrackedSan Bernardino healthcare Proprietary under_construction
3-story O.B. Addition is under construction — steel scope is likely locked. This project is outside ConXtech's target metros but the 3-story healthcare profile is a fit for the proprietary system. Research the GC for future relationship building. Victor Valley/High Desert is a growing healthcare market — monitor for future phases.
HCAI Healthcare — State TrackedSan Bernardino healthcare planning
Med/Surg and ED Addition is a substantive healthcare building scope. Contact Mountains Community Hospital to understand building size and structural plans. Track HCAI approval progress. Note: Lake Arrowhead is a remote mountain location — assess logistics for steel delivery and erection.
HCAI Healthcare — State TrackedSan Jose healthcare Proprietary under_construction
El Camino Health expansion under construction — research which GC won the project. If it's a known partner, build the relationship for future phases. El Camino Health has been investing heavily in campus modernization; track for Phase 2+ scopes. Check if any future buildings are in planning.
HCAI Healthcare — State TrackedRiverside healthcare planning
Emergency Department Addition in 'Proposed' status — investigate scope (stories, sqft, structural type). County-owned health system — may go through public procurement. Monitor for RFP/IFB. Also track Wellness Center (OSHPD 5) as potential conventional steel opportunity.
HCAI Healthcare — State TrackedOrange County healthcare Proprietary permitted
Surgery Addition is under construction — research which GC was awarded. The proposed utility buildings (pump houses, tanks) are low-steel-scope items. The main opportunity may have passed for the Surgery Addition, but investigate whether there are future phases or if the GC is a known partner. Contact UCI Health facilities planning about upcoming campus projects.
HCAI Healthcare — State TrackedSan Jose healthcare Proprietary under_construction
Large county hospital campus expansion with 4-story Stair Tower and ED Addition under construction, plus multiple proposed utility structures. Research which GC is handling the current construction phase — likely a known ConXtech partner (DPR, Swinerton, or McCarthy commonly do county hospital work). The proposed wastewater tanks and MRI awning may represent upcoming bid packages. Also track for future phases — county medical centers often have multi-phase master plans.
This is a major county medical center campus expansion in San Jose with multiple buildings at various stages. While key structures are already under construction, the proposed utility elements and the scale of the campus suggest future phases. County projects in Santa Clara often use GCs from ConXtech's known partner list.
HCAI Healthcare — State TrackedOakland healthcare planning
SPD (Sterile Processing Department) Addition is proposed — likely a small single-story addition. Steel scope may be below $1.5M threshold. Monitor for scope details. Near ConXtech HQ — low-cost pursuit if scope is sufficient. Research if this is part of a larger campus modernization.
HCAI Healthcare — State TrackedLos Angeles healthcare Proprietary under_construction
9-story hospital exceeds ConXtech's 6-story proprietary system sweet spot, and project is under construction — primary steel scope is likely awarded. However: (1) Research the GC — if it's a known partner, build the relationship for future Cedars-Sinai work. (2) Check if the 2-story Central Utility Plant or other support buildings still need steel subcontractor. (3) Track Cedars-Sinai for future campus phases. (4) The hospital building itself may have been concrete frame at 9 stories.
While the main 9-story hospital is under construction and exceeds ConXtech's ideal height range, this massive Cedars-Sinai campus project includes multiple support structures (Central Utility Plant at 2 stories, Loading Dock, Gas Yard) that may still have steel procurement opportunities. More importantly, identifying the GC on this project opens relationship doors for future Cedars-Sinai work.
HCAI Healthcare — State TrackedOrange County healthcare planning Prefab-Friendly Owner
Kaiser Irvine — multiple tanks suggest a larger campus project may be underway. Monitor HCAI for associated hospital/MOB building permits. Contact Kaiser SoCal Facilities Planning to inquire about the broader Irvine campus development program.
HCAI Healthcare — State TrackedSan Jose healthcare Conventional planning
O'Connor Hospital in San Jose has a 2026 HCAI filing for utility infrastructure (water tanks, wastewater tanks, pump house, medical gas canopy). The steel scope on these utility structures alone is likely below ConXtech's $1.5M threshold. However, O'Connor is owned by HCA Healthcare, and this infrastructure work may support a larger SB 1953 compliance project. Monitor for additional building filings. Note: Medical Gas Canopy is already under construction — identify the GC.
HCAI Healthcare — State TrackedOrange County healthcare under_construction
Surgery Addition already under construction — too late for this phase. Identify the GC on the Surgery Addition for relationship building. Monitor UCI Health's Orange County campus plans for future phases. UCI Health is expanding aggressively across OC (see also Placentia Linda in this batch).
HCAI Healthcare — State TrackedLos Angeles healthcare under_construction
Acute Care Services Replacement Building is already under construction — too late for current phase. Research the GC on this project for relationship building. Monitor for future phases or additional campus construction that may follow the replacement building completion.
HCAI Healthcare — State TrackedSan Jose healthcare Proprietary under_construction
Under construction — research who the GC is for BHS Link and Wing J. If it's a known ConXtech partner, reach out to understand if there are future phases or additional buildings planned. El Camino Health is a major Bay Area health system with ongoing campus modernization.
HCAI Healthcare — State TrackedLos Angeles healthcare under_construction
Major hospital campus largely under construction — identify the GC (likely McCarthy or Hensel Phelps for LA County projects of this scale). Research whether future phases or additional buildings are planned. The Interim Helipad 'Proposed' status suggests ongoing work; engage GC for any remaining structural packages.
HCAI Healthcare — State TrackedLos Angeles healthcare Proprietary under_construction
ED & ICU Addition under construction — steel scope is likely locked. Research GC for relationship building. Emanate Health is an active builder — monitor for future campus projects.
HCAI Healthcare — State TrackedSan Jose healthcare under_construction
Utility infrastructure only — tanks and pump house have minimal structural steel scope. However, O'Connor Hospital is part of the Santa Clara County Health System. Monitor for larger building projects. Check if this infrastructure supports a future building expansion that hasn't been filed yet.
HCAI Healthcare — State TrackedRiverside healthcare planning
Loma Linda Murrieta campus has multiple utility infrastructure permits — may signal a larger hospital expansion. Research Loma Linda's capital plan for Murrieta campus to determine if building construction is planned.
HCAI Healthcare — State TrackedSan Diego healthcare Conventional under_construction
Large campus expansion mostly under construction — research the GC. If it's a known partner (RQ Construction, Sundt, or others active in San Diego), use this as a relationship touchpoint. Sharp HealthCare has multiple campuses — monitor for future capital projects. Campus connectors may still have steel scope if not yet fabricated.
HCAI Healthcare — State TrackedSan Jose healthcare Proprietary under_construction
El Camino Health campus expansion (Wing J, BHS Link, Women's Hospital canopy) is under construction — current steel scope is likely locked. However, El Camino Health has a multi-phase campus master plan. Research the GC on the current phase — if it's a known ConXtech partner, leverage the relationship for future phases. El Camino is a well-funded district hospital in Mountain View with ongoing seismic compliance needs.
HCAI Healthcare — State TrackedLos Angeles healthcare under_construction
Major public hospital project already under construction — structural steel likely awarded. Research which GC won this (likely McCarthy, Hensel Phelps, or similar). Track for future phases or campus expansion projects. The Interim Helipad (Proposed) is too small for meaningful steel scope.
HCAI Healthcare — State TrackedVentura healthcare planning
Utility infrastructure scope (tanks, pump house) — not structural steel building construction. Below ConXtech's minimum steel scope. Monitor St Johns Regional Medical Center for future building construction projects (patient towers, MOBs).
HCAI Healthcare — State TrackedOrange County healthcare under_construction
Project is well into construction — no immediate opportunity for primary steel. Research the GC for relationship building. Hoag is an active hospital system in Orange County — monitor for future campus expansions or new facilities. Track Hoag Memorial Hospital Presbyterian's capital plan.
HCAI Healthcare — State TrackedLos Angeles healthcare planning
The utility infrastructure (water tanks, wastewater tanks) suggests a larger hospital expansion or new construction project is being planned. Research MLK Community Hospital's master plan — there may be a main hospital building phase coming. Monitor HCAI for additional building permits. Contact MLK Community Hospital facilities to understand the full scope of the campus expansion.
HCAI Healthcare — State TrackedSan Diego healthcare under_construction
Sharp Memorial campus expansion is primarily under construction — identify the GC and steel sub on this project for relationship intelligence. Monitor for future Sharp HealthCare capital projects (Sharp has multiple campuses in San Diego). The proposed Electrical Yard alone is too small for ConXtech.
University Capital PlanSeattle education planning Prefab-Friendly Owner
Historic Shell House integration — likely adaptive reuse with limited new structural steel. Monitor for scope details. More valuable as a UW relationship touchpoint. Focus BD effort on Haggett Hall and Chemical Sciences Building instead.
University Capital PlanOakland hd residential Conventional awarded Prefab-Friendly Owner
This misc. metals bid is closed but the Bancroft Student Housing project is a large campus housing project. Research who won the GC and structural steel contracts. Look for future phases or similar UC housing projects. The misc. metals scope alone is below ConXtech's threshold but the overall project may have had a structural steel package ConXtech missed.
University Capital PlanSeattle healthcare planning Prefab-Friendly Owner
Hospital floor renovation — structural steel scope likely minimal (interior renovation, not new construction). Monitor for any structural reinforcement requirements, but this is unlikely to meet the $1.5M minimum steel scope threshold. More valuable as a relationship touchpoint with UWMC facilities team — could lead to future new-construction healthcare projects.
HCAI Healthcare — State TrackedContra Costa healthcare planning
Bay Area healthcare with no GC selected — but currently only utility structures (tanks, pump house) are filed. These are often precursors to larger building projects. Contra Costa County is a known ConXtech relationship. Monitor for building additions and research broader campus master plan.
HCAI Healthcare — State TrackedOrange County healthcare Proprietary under_construction
Major hospital campus expansion already under construction — research the GC and look for future phases. Hoag is a major Orange County health system with ongoing campus development. The current steel opportunity has likely been awarded, but future phases may present opportunities.
HCAI Healthcare — State TrackedLos Angeles healthcare Conventional under_construction
Under construction with multiple buildings — research the GC and steel subcontractor. The West Wing and bridge components would have significant steel. Monitor for future phases. Olympia Medical Center is undergoing a major renovation/expansion.
HCAI Healthcare — State TrackedLos Angeles healthcare planning
Multiple water and wastewater tanks with a pump house — classic precursor to a major hospital construction project. Research Torrance Memorial / Cedars-Sinai (parent system) capital plan for this campus. Monitor HCAI for building filings. The 2026 CAP number means this was recently filed — an early signal worth tracking.
HCAI Healthcare — State TrackedSan Bernardino healthcare planning
Utility infrastructure only (pump house and tanks) — not ConXtech building scope. However, Loma Linda University Health is a major health system with ongoing campus development. Research whether a new surgical hospital building is planned that these utilities serve. If a multi-story building is in the pipeline, escalate.
HCAI Healthcare — State TrackedLos Angeles healthcare Conventional under_construction
Multi-building healthcare expansion under construction. Identify GC for relationship building. West Wing and other structures suggest significant scope but opportunity has likely passed for this phase.
HCAI Healthcare — State TrackedLos Angeles healthcare planning
USC Norris Cancer Hospital has multiple proposed utility infrastructure filings — often a precursor to a larger hospital modernization. Monitor HCAI for building structure filings at this campus. Research USC Keck Medicine capital plan for upcoming projects.
HCAI Healthcare — State TrackedVentura healthcare Conventional under_construction
Small-scale hospital expansions (canopy, dietary, waiting room) — all 1-story and likely below ConXtech's minimum steel scope. Not a current opportunity. Monitor Los Robles for future major building additions.
Las Vegas (Boulder City is ~25 miles SE of Las Vegas)
data center
$500M-$1B+
conceptual
No GC
Track this project closely — 170MW campus in Nevada is a massive opportunity in a target metro (Las Vegas). No GC selected yet. Research Skylar Capital and Overwatch Capital contacts. ConXtech's seismic SMF solution and speed-to-market value prop are relevant for NV. Identify the design team and engage early to influence structural system selection. Monitor Clark County planning/permitting for entitlement filings.
URGENT — due 2026-04-02. IDIQ MACC for commercial and institutional buildings in SoCal is a strategic vehicle. ConXtech should pursue as a sub to a known GC partner bidding this (check if Hensel Phelps, McCarthy, Sundt, or Tilden Coil are priming). Contact BD immediately — 2 days until due.
NAVFAC is a known prefab-friendly owner. Download full solicitation from SAM.gov immediately and identify if this is a design-build or hard-bid. Check for steel package breakout. Submit qualifications or identify GC teams forming for this bid before 2026-05-28 deadline.
QTS campus expansion near Dallas — target metro, data center type, no GC selected yet. Research QTS procurement contacts and GC relationships. Monitor for permit filings in Wilmer/Ellis County. Reach out to known GC partners active in DFW data center market (e.g., DPR, Hensel Phelps, Holder).
Massive 600MW data center in California — high-seismic zone is ideal for ConXtech's proprietary SMF system. No formal application yet, so this is very early. Monitor Coachella city planning agendas for formal submittal. Identify the developer (likely a hyperscaler or major colo provider). Position ConXtech for structural steel packages on individual buildings within the campus.
No GC selected — research the developer/owner for 2402 2nd Ave. New mixed-use construction in Seattle with 83 units is likely 4-6 stories and steel-framed. Reach out to owner/architect to introduce ConXtech proprietary system for schedule advantage. Check if Fortis, Mortenson, or other PNW known partners are pursuing.
Contact Suffolk Construction immediately — ★ Known Partner. $1.2B multiphase student housing using modular/prefab approach aligns perfectly with ConXtech proprietary system. Ask about structural steel packages for Building A/B and future phases. Suffolk's use of 'advanced modular fabrication' signals openness to prefab steel.
$15M–$50M (speculative — Navy Yard new construction)
bidding
No GC
NAVFAC is a known prefab-friendly owner. Download full solicitation from SAM.gov immediately. Identify primes bidding this — look for Suffolk Construction, Turner Construction, or Gilbane. Offer ConXtech as structural steel sub to prime bidders. Deadline 2026-05-28.
$2.1B (Q1 2026 starts); $4B-$5B total 2026 pipeline
awarded
No GC
Prologis is based in SF and ramping $1.3B in data center development — identify specific project sites in CA/target metros. Reach out to Prologis development/construction team to position ConXtech for structural steel packages. Cross-reference with permit databases for individual site locations. Data centers are strong steel fit and Prologis's Bay Area HQ aligns with ConXtech geography.
Unknown — IDIQ vehicle likely $50M–$500M ceiling across task orders
bidding
No GC
Review full solicitation on SAM.gov immediately — determine contracting agency (NAVFAC = known ConXtech relationship). Identify if ConXtech can prime or if partnering with a MACC holder is required. If NAVFAC, leverage past NAVFAC work. Deadline is May 26 — submit qualifications or partner with a prime bidder within 2 weeks.
Research the GC on this project immediately — check if Turner, Suffolk, or another known partner won the CM contract. If under construction, determine if future phases or fit-out packages still need structural steel. A $865M hospital expansion likely has multiple buildings/phases. Contact MassDevelopment or MGH facilities for project phasing details.
Sources Sought closes May 11 — monitor SAM.gov for full RFP release. NASA Ames is in Moffett Field (Mountain View), core Bay Area territory. Design-build delivery means the winning GC will select steel sub. Reach out to ConXtech GC partners likely to bid federal work: Hensel Phelps (★), DPR (★), Jacobs (★), Mortenson (★), Sundt (★). Position ConXtech's proprietary system for schedule advantage in design-build proposal.
Data center campus in a ConXtech target metro (Pittsburgh). No GC selected — engage Switch's construction/development team now to position ConXtech for Phase 1 structural steel. Identify A/E team and track permitting through Allegheny County or surrounding municipality.
IDIQ ceiling likely $100M-$500M+ across all task orders
bidding
No GC
This is a national Design-Build IDIQ for DHA healthcare construction — ConXtech should identify which GC primes are bidding (check DPR, Hensel Phelps, McCarthy, Turner, Jacobs, Boldt — all known partners with federal healthcare experience). Reach out to offer structural steel subcontractor teaming on their MATOC proposals. Deadline is May 15 — act immediately.
$20M-$50M (current scope); $300M+ if full replacement
planning
No GC
Water/wastewater tanks are often precursors to a larger hospital construction project. Research whether Paradise Valley Hospital has a full replacement or expansion planned — this could be an early signal for a major steel scope. Monitor HCAI for additional building permits under this campus.
Healthcare project in Sacramento awarded to Tutor Perini — not a known ConXtech partner but a major national GC. Research the owner (likely a health system or orthopedic group). Reach out to Tutor Perini's Sacramento office to present ConXtech's healthcare steel portfolio and schedule advantage. Also identify the architect of record for early structural system influence.
Massive 1M+ SF manufacturing campus just approved — no GC selected yet. Reach out to Celestica's project development team and their likely architect/engineer. Position ConXtech for mezzanine and conventional structural steel scope. Also monitor for GC selection — this will likely go to a national CM firm. Track for design-build structural steel RFP opportunities.
Federal solicitation due 2026-06-23 — review full RFP on SAM.gov immediately. Supportive housing is likely 2-4 story repetitive bay construction, ideal for ConX proprietary system. Identify if this is design-build and which GCs (Hensel Phelps, Turner, Sundt) may be bidding. Reach out to potential GC primes to offer structural steel subcontract.
Research the Colorado developer identity and track this campus for phased building opportunities. Data center structures are typically 1-2 stories with repetitive bays — good fit for either proprietary or conventional system. Temple is near Austin (target metro). Identify architect and watch for GC selection on Phase 1.
Prime Data Centers SMF02 is in Sacramento — a ConXtech target metro. Research GC selection status for SMF02 immediately. Data centers align with proprietary system speed advantage. Also investigate CloudBurst Texas campus for conventional steel opportunities. Contact Prime Data Centers development team to position ConXtech for structural steel on current or next phase.
Austin (Bastrop County is ~30 miles east of Austin)
data center
$800M-$1.2B
planning
No GC
Two massive data centers near Austin — a target metro. No GC selected yet. Research EdgeConneX's preferred GC roster (they have worked with Holder, DPR, and others nationally). Engage early to position proprietary system for repetitive bay structures. Track permitting progress in Bastrop County.
Dallas-Fort Worth (likely, based on Texas data center corridor)
data center
$2B-$5B
conceptual
No GC
Google is a known prefab-friendly owner — leverage that relationship angle. Monitor for site selection confirmation and GC procurement. Research Nexus Data Centers' construction procurement process. Texas is a target region (Dallas/Austin/Houston). Watch for permit filings once site is confirmed. ConXtech conventional steel or proprietary system could fit depending on building configuration.
JBLM is near Seattle — PNW seismic zone is a ConXtech sweet spot. Research which GCs are bidding (check if Hensel Phelps, Mortenson, or Bouten Construction are pursuing). Contact known partners bidding this to offer proprietary or conventional steel package. Due 2026-04-10.
Switch expanding Las Vegas data center campus — 300 acres signals massive buildout. Las Vegas is a target metro. Research Switch's preferred GC relationships (historically used Mortenson, which is a ★ Known Partner). Track for design team announcements and permitting milestones. Prepare data center structural steel qualifications package.
Research Zapalac/Reed Construction — 4-story office in Austin is a proprietary system candidate. Reach out to GC about structural steel package. Confirm if steel-framed.
Review SF Planning Commission agenda for 2026-04-23 (hearing #305) to determine if any commercial, healthcare, mixed-use, or institutional projects are on the docket. Flag any multi-story new construction for further tracking.
This is a MATOC vehicle for vertical construction — getting on-ramped opens pipeline of future task orders. Download solicitation and evaluate if ConXtech can pursue directly or partner with a GC team. Deadline 2026-04-28 — act quickly. Identify which GCs from the known partner list may be pursuing this MATOC.
Military industrial facility in PA — conventional steel fit for distribution facility. Download full solicitation from SAM.gov. Identify if structural steel is broken out as a subcontract scope. Reach out to GC teams that may be bidding (check if Hensel Phelps, Turner, or Jacobs are pursuing). Deadline 2026-05-08.
Large mixed-use development near Boston (target metro) moving forward — originally planned as lab space, now mixed-use on ~10 acres. No GC selected. Track Needham planning board for approvals, identify architect, and reach out to Bulfinch Companies about structural steel. Conventional steel scope for East Coast. Engage Suffolk Construction (known partner active in Boston market).
Massive industrial project in CA — no GC selected yet. ConXtech conventional steel or mezzanine scope could be significant on individual warehouse buildings. Research Covington Group's preferred GC list and reach out to developer about structural steel packages for Phase 1 buildings. Also monitor for mezzanine opportunities in warehouse fit-outs.
Monitor project development closely. Cedar Park/Austin is a ConXtech target metro. Identify the developer and architect as they are announced. R&D/lab buildings often require steel moment frames — prepare to present ConXtech's speed and seismic capability for industrial R&D structures. Check Austin Business Journal for follow-up reporting on timeline and design team.
Review SF Planning Commission agenda for 2026-04-16 (hearing #304) to identify project details — address, sponsor, project type, and building size. Flag any mid-rise commercial, healthcare, mixed-use, or institutional projects for deeper research.
Phase 1 breaks ground August 2026 — steel procurement happening NOW. Identify the GC for Phase 1 immediately. Soundstages require clear-span steel structures (conventional steel fit). Office building could be proprietary or conventional. Dallas is a target metro. Contact Super Studios USA or their construction manager to offer structural steel services for Phase 1 and future phases.
$2.1B (Q1 2026 starts); $4B-$5B projected 2026 total
awarded
Unknown
Research specific Prologis data center project locations — identify any in CA, NV, PNW, or TX target metros. Prologis typically uses repeat GC relationships; identify their GC partners for data center work and cross-reference with ConXtech known partners. Engage Prologis development team to understand structural steel procurement approach for their data center pipeline.
$10M–$30M (estimated for Navy Yard new construction)
bidding
No GC
NAVFAC is a known prefab-friendly owner. Download solicitation documents from SAM.gov immediately to assess steel scope and structural requirements. ConXtech conventional steel could serve this — Boston is a target metro for conventional work. Identify the prime GC bidders and offer steel subcontract pricing.
Monitor SAM.gov for full RFP release (due May 8 presolicitation). Determine if this is a design-build procurement. If so, identify which GCs will bid (Hensel Phelps, Sundt, and Jacobs are known ConXtech partners active in federal/military work). Reach out to offer structural steel package as a sub.
Note: Type IIIA over Type IA podium — the upper 5 stories are wood-frame (Type IIIA), only the ground-floor podium and subterranean parking are Type IA (steel/concrete). ConX opportunity is limited to the podium level steel only, which reduces scope significantly. Research the developer and determine if the podium steel is a viable standalone scope worth pursuing. If podium is concrete, disqualify.
Track this project closely — 511K sqft facility filing is a strong early signal. IBM campus expansion in NY could involve conventional steel. Identify architect and project manager. Monitor for GC selection and procurement timeline. Poughkeepsie is within reach of NE conventional steel operations.
Track East Windsor planning board for approval decision. Data center expansion in NJ target metro — once approved, identify GC selection timeline and engage QTS facilities/development team about structural steel package. Conventional steel may fit if 1-2 story; proprietary if multi-story.
Monitor entitlement progress in Uhland, TX. Research PowerHouse Data Centers' construction partners and procurement timeline. Data center campuses often use 1-2 story steel structures with repetitive bays — strong system fit if scope materializes. Reach out to PowerHouse development team to introduce ConXtech's speed-to-market advantage for data center structural steel.
3-story OB addition is a good fit type but already under construction. Identify the GC and steel subcontractor for relationship building. Monitor for future campus expansion phases.
Groundbreaking just occurred — immediately research the GC and steel subcontractor. If steel package hasn't been awarded, reach out. Also identify if Prime has additional phases planned in Sacramento. Sacramento is a target metro and data centers are a strong fit type.
Monitor SAM.gov for full solicitation release. VA housing + welcome center in LA is a strong metro fit. Identify which GCs will bid — DPR, Hensel Phelps, and Turner frequently pursue VA work. Reach out to known partner GCs to offer structural steel pricing support.
Monitor Amazon's Austin-area data center plans. 1,300 acres suggests massive campus buildout. Track permitting and entitlement filings in Travis/Williamson County. Identify Amazon's preferred GC partners in Texas (DPR, Hensel Phelps, Mortenson are all active in data center work). Position for early phases — data center buildings are often 1-2 story steel structures that could fit ConX conventional or proprietary system.
NAVFAC is a known prefab-friendly owner. Monitor this project through NAVFAC Southwest. Identify the A/E firm of record and track for eventual GC solicitation on SAM.gov. ConXtech has NAVFAC history — prepare to engage design team on structural system early.
Sources sought phase — submit capability statement emphasizing federal courthouse experience and conventional steel capabilities in the Northeast. Track for full RFP release. Identify which national GCs (Turner, Hensel Phelps, Gilbane) will pursue and position ConXtech as steel sub.
This specific project is under construction, but Hensel Phelps is a known ConXtech partner and SFO is a known prefab-friendly owner. Use this as a relationship touchpoint — contact Hensel Phelps Bay Area office to discuss upcoming SFO phases or other airport expansion projects. SFO has a multi-billion dollar capital improvement program with additional phases coming.
Track this project closely — a new medical school campus is a major institutional project with significant structural steel scope. Conventional steel opportunity in the Northeast. Monitor for architect selection and procurement timeline. Engage Temple University facilities team early.
★ Blach Construction is a Known Partner. Project is small (12,500 sqft) and likely below steel scope threshold, but contact Blach to maintain relationship and inquire about future Milpitas USD phases or other education projects in their pipeline.
This is a Sources Sought — respond by June 2 to register interest. Simulator facilities are typically single-story high-bay steel structures. Moffett ANGB is in ConXtech's backyard (Hayward). Research whether NAVFAC is administering — if so, leverage existing NAVFAC relationship. Prepare capability statement for federal submission.
Data center in Reno (target metro) just broke ground — immediately research GC selection. 230MW campus suggests massive steel scope. If steel sub not yet locked, ConXtech could compete on conventional or proprietary for support structures. Contact Fleet/Tract development team to identify GC and structural steel bidding status.
This is an IDIQ MACC covering Southern California — ConXtech's target region. Review the solicitation immediately to determine if ConXtech can team with a GC pursuing this contract. Identify which known GC partners (Sundt, Hensel Phelps, Turner, McCarthy) may be bidding and offer structural steel teaming. Due 2026-05-29 — URGENT.
Review full solicitation on SAM.gov for structural scope details. TSH likely multi-story residential-type structure in LA — check if steel framed. If so, reach out to known GC partners (Sundt, Bernards, MATT Construction) who bid VA work in SoCal. Deadline June 23.
Research Advanced Process Solutions contacts and identify GC selection timeline. Dallas is a target metro — reach out to owner's facilities team about structural steel package. Could also include mezzanine scope for manufacturing support areas.
No GC selected — research Edged Energy's construction partners and reach out to their development team about structural steel package. Fort Worth is in the Dallas-Fort Worth target metro. Monitor for permit filings and GC selection.
NAVFAC is a known prefab-friendly owner. This is a design-build laboratory — review solicitation for structural scope and NAICS. Identify design-build teams likely to bid (Jacobs, Hensel Phelps, Turner are ConXtech partners with federal experience). Submit qualifications to potential DB teams before 7/15 deadline. Consider if conventional steel scope is viable from NE partner fab shops.
New construction CDC at Fort Hamilton, Brooklyn — NY target metro. Review solicitation for structural steel scope and set-aside requirements. Identify GC bidders — Turner, Hensel Phelps, and Suffolk are ConXtech partners active in NY federal work. Due 6/29 — reach out to potential GC teams now.
Boston target metro — Navy Yard construction project. Review solicitation details for structural scope and building size. Due 6/16 — urgent. Identify GC bidders; Suffolk Construction (★ Known Partner) is very active in Boston. Contact Suffolk BD team about this opportunity.
Track this project through permitting. Boston is a target metro for conventional steel. Research City Realty Group's GC relationships and project details (building count, heights, structural type). Engage when design development begins — conventional steel opportunity on Route 9 mixed-use development.
University housing redevelopment in Philadelphia — a target metro for conventional steel. Track project scope and structural system selection. Greystar is one of the largest multifamily developers nationally. Research whether this is new construction or renovation. If mid-rise steel frame, could be a fit for conventional or proprietary system. Monitor for GC selection and design team announcements.
Review full solicitation on SAM.gov immediately — due 6/23. Supportive housing at West LA VAMC could be multi-story steel frame in target metro. Identify if a known GC partner (e.g., Hensel Phelps, Turner) is bidding and offer to sub structural steel. VA projects often have SDVOSB/set-aside requirements — verify eligibility path.
Data center in Seattle (target metro, high-seismic zone) at former Bed Bath & Beyond site — determine if this is adaptive reuse or ground-up new construction. Contact Digital Realty's development team to understand structural approach. If new construction, ConXtech proprietary system is a strong fit for speed and seismic performance. Engage Fortis Construction or Mortenson (★ Known Partners active in PNW) to position for GC selection.
Research exact Texas location — if near Austin/Dallas/Houston, pursue aggressively. $4.25B financing signals imminent GC selection. Identify Hut 8's construction/procurement contacts. Data centers often have 1-2 story steel structures with repetitive bays — strong conventional or proprietary fit depending on design. Monitor for GC solicitation.
Military dormitory — typically 2-4 stories with repetitive floor plans, which is a strong fit for proprietary system. However, Hampton, VA is outside core target metros. Identify which GCs are pursuing this (check if Hensel Phelps or Whiting-Turner are bidding). If a known partner is priming, offer structural steel package.
Research this solicitation on SAM.gov for location, scope, and size details. If located in a target metro and involves steel-framed construction, identify GC partners who may be bidding. Secure/classified facilities can sometimes be concrete-only — confirm structural system.
Due date is today — likely too late for this submission. However, this is a design-build hangar project with significant steel scope. Monitor for any extension or re-solicitation. If a known GC partner (Hensel Phelps is active in DoD DB) is pursuing, ConXtech could still be contacted as a steel sub. Hangars are typically long-span which is less ideal for proprietary system but strong for conventional.
Amazon 1GW data center campus in rural Oregon — massive scope but very early and remote location (Morrow County is ~3hrs from Portland). Monitor for design team and GC announcements. Amazon typically uses DPR (★ Known Partner) or Hensel Phelps (★ Known Partner) for data center work. Track through AWS construction procurement channels.
Monitor SAM.gov solicitation (due 2026-06-15). Military hangar likely large-span conventional steel. Identify which GCs are bidding — Hensel Phelps and Sundt are known ConXtech partners active in federal work.
Strategic opportunity — DHA IDIQ for design-build healthcare construction. ConXtech should identify which GC partners (Hensel Phelps, Jacobs, Boldt, Turner) are pursuing MATOC primes and position as steel subcontractor on their teams. Due April 20.
$15M–$40M (estimate for military facility buildings)
bidding
No GC
JBLM is in the PNW (Tacoma/Seattle metro) — high seismic zone where proprietary system adds value. Due April 20. Identify which GCs are bidding — Hensel Phelps, Mortenson, and Fortis Construction are known partners active in PNW federal work.
This is a market survey (Sources Sought) for new barracks construction in Dublin, CA — ConXtech's backyard. Respond to the market survey by 2026-04-10 to register interest. Barracks are typically 2-4 story repetitive floor plans — strong fit for proprietary system. Track for full solicitation release.
Monitor for site-specific facility announcements. $7B campus will break into multiple buildings — watch for individual data hall packages in the $5M-$20M steel scope range. Texas is a target region (Austin/Dallas/Houston preferred but West Texas possible). Track for GC selection announcements.
Review the full article for specific data center projects in target metros (San Jose, Sacramento, LA, Portland, Seattle, Las Vegas, Dallas, Austin, Houston). Flag any projects by CoreSite or Google (prefab-friendly owners). Look for 2-6 story facilities under 100MW that may use steel frame. Extract developer, location, and GC details for each relevant project.
Sources Sought stage — monitor SAM.gov for full solicitation. Military munitions facility in NV likely requires significant structural steel. Identify which GCs are pursuing and whether any known partners (Hensel Phelps, Sundt) will bid. Respond to Sources Sought if ConXtech can position as a steel sub.
Letterkenny Army Depot is in Chambersburg, PA — within ConXtech's conventional steel territory. Large military maintenance facility will require significant structural steel. Monitor solicitation and identify GC bidders — check if Hensel Phelps or Turner are pursuing. Position for conventional steel subcontract.
★ Sundt Construction is a known ConXtech partner and is the design-build GC. Contact Sundt's San Diego office about the structural steel package for this performing arts facility. At 28K sqft, steel scope may be below $1.5M threshold — confirm scope size. Part of $3.5B bond program — identify other projects in the Measure HH pipeline that may be larger.
Review full solicitation on SAM.gov for scope details. Munitions distribution facility likely a large single-story steel structure — conventional steel fit for PA region. Identify if there is a GC priming this and reach out as steel sub. Due 2026-05-08.
Monitor SAM.gov for full RFP release. Hangar construction in Brooklyn — structural steel is likely the primary structural system. Identify priming GCs interested in this and position ConXtech as steel sub. NY metro is target region.
Orlando Health $183M healthcare expansion in Central Florida — healthcare is a priority type but Florida is not a target region. Monitor for structural system decisions. If ConXtech expands SE footprint or if a known GC partner (e.g., Skanska, Turner) is selected, reconsider pursuit.
MACC vehicle — total value unclear, likely $50M-$200M ceiling
bidding
No GC
MACC procurement at Johnson Space Center in Houston (target metro) — due in 3 days, likely too late to bid as prime. However, ConXtech could reach out to GCs bidding as primes to offer structural steel sub support on future task orders. Identify which known GC partners (Hensel Phelps, Jacobs, Boldt) may be pursuing this MACC.
Aligned Data Centers 'Project Caprock' breaking ground near Lubbock, TX. Texas is a target region but Lubbock is not a target metro. Research the GC — if it's a known partner, reach out about structural steel packages on future phases/buildings. Multi-building campuses often award steel building-by-building.
Research this project — Northgate is an active development area in Seattle (near Northgate Station light rail). Determine project type, size, and developer. If it's a mid-rise mixed-use or commercial project, ConXtech's proprietary system is a strong fit in the PNW seismic zone. Check Seattle DPD records for project details and architect.
Monitor for progress past community opposition. Tucson is not a core ConXtech metro, and hyperscale campus may use tilt-up or precast for shell. If project advances, identify GC selection process and look for individual building packages that could fit ConXtech scope.
Review sources sought documentation by April 27 deadline. PA/NJ/DE aligns with ConXtech's conventional steel East Coast focus. Determine if ConXtech can respond as a subcontractor teaming partner with a GC pursuing the IDIQ. Identify which GCs are likely primes — check if any Known Partners are bidding.
Military maintenance facility in PA — conventional steel fit for Northeast operations. Download full solicitation from SAM.gov, assess steel scope and structure type. Identify GCs bidding this and offer conventional steel package. Due date May 28, 2026.
Research XSpace Houston project — identify GC and structural engineer. This is XSpace's second Texas project, so there may be a relationship to build for future phases. If steel is not yet awarded, contact GC immediately. Houston is a target metro.
Monitor zoning appeal outcome later this month. If approved, identify the developer/owner and structural requirements. Two-building data center campus in PA could fit conventional steel scope. Track for GC selection timing.
Watch SAM.gov for full RFP release. Communications headquarters facility could be 1-3 story steel-framed building. Not in a primary target metro but could be conventional steel scope. Identify prime contractors likely to bid when solicitation drops.
Monitor entitlement/zoning progress for this site outside Pittsburgh. Data centers are a priority vertical. Track Provident's development timeline and identify the design team once engaged. Pittsburgh is a target metro for conventional steel.
This is a DHA design-build MATOC — ConXtech cannot hold a prime MATOC but should identify which GCs are pursuing this vehicle. Cross-reference with known partners (Hensel Phelps, Jacobs, Boldt Company, Sundt all have federal healthcare experience). Reach out to those GCs to position as structural steel subcontractor on future task orders. DHA facilities are healthcare — strong system fit if task orders land in target metros.
Federal vertical construction MATOC on-ramping — identify which known GC partners (Hensel Phelps, Jacobs, Sundt, Mortenson) are pursuing on-ramp. Position ConXtech as structural steel sub for future task orders. 'Vertical Construction' language is a positive signal for steel-framed buildings.
At $16.5M total project value, steel scope may be under ConXtech's $1.5M minimum. Monitor for structural details. If steel-framed operations building, could be a small conventional scope. Worth tracking as part of broader UCLA relationship strategy.
Monitor for specific project announcements from this fund — particularly office-to-residential conversions in NYC which may require structural steel modifications. Track which developers receive capital allocations and watch for individual building projects entering design/permitting. NYC affordable housing often uses steel framing for mid-rise (5-6 story) buildings.
Unknown — likely $5M-$15M range for minor VA construction
bidding
No GC
Review full solicitation on SAM.gov to assess project size and steel scope. 'Minor Construction' label suggests this may be below ConXtech's $1.5M steel scope minimum. If scope is adequate, identify which GCs are bidding — VA projects often attract large national firms including some ConXtech partners.
Review full solicitation on SAM.gov for project scope, stories, and structural system. Military dormitories are often 2-4 story steel-framed buildings with repetitive bay spacing — potential proprietary system fit. Identify which GCs are pursuing and cross-reference with ConXtech partners. Hampton, VA is outside target metros but worth pursuing if a known GC partner is bidding.
Pittsburgh area (New Castle is ~50 mi NW of Pittsburgh — within target region)
government
$15M-$40M (typical military maintenance facility range)
bidding
No GC
Review full solicitation on SAM.gov for project details. PA is within conventional steel target region. Military maintenance facilities are typically 1-2 story steel and joist construction — good conventional steel fit. Check if any ConXtech partner GCs are pursuing this bid. New Castle is within the Pittsburgh metro catchment area.
Monitor for formal submissions and identify the developer/owner. PA is in ConXtech's conventional steel territory. A $1.7B data center campus would have massive steel scope across multiple buildings. Track for developer identity, site plan filings, and GC selection — this is 12-18 months out but could be a landmark project.
Monitor project progress. El Paso is not a core ConXtech metro, and hyperscale data centers are typically single-story tilt-up or precast — not ideal for ConX proprietary system. However, the scale is massive. Research structural system; if any buildings are multi-story steel frame, engage. Track GC selection.
NAVFAC is a known prefab-friendly owner. Download full solicitation from SAM.gov before 5/28 deadline. Determine if this is new construction with structural steel scope. If so, pursue as conventional steel opportunity in Boston market. Check if any known GC partners are bidding.
$5M–$15M (estimated VA education facility renovation)
planning
No GC
Las Vegas is a target metro and high-seismic zone. This is a VA presolicitation — watch SAM.gov for full RFP release. Download presolicitation documents to assess whether renovation includes structural steel replacement or addition. If structural scope is significant, ConXtech proprietary system could apply for any new construction elements.
Monitor for GC selection and construction phasing. A $20B fab will have support buildings, office structures, and industrial mezzanines that could fit ConXtech's scope. Watch for sub-phase procurement — fab support buildings (2-4 stories) and mezzanines in manufacturing spaces could be actionable. Track which GC wins the prime contract.
MATOC ceiling likely $10M–$100M+ across multiple task orders
bidding
No GC
WAPA DSW (Desert Southwest) and SNR (Sierra Nevada) regions likely cover CA, NV, AZ — ConXtech target territory. Download solicitation to determine if structural steel subcontracting opportunities exist within the MATOC scope. Identify prime GC bidders and offer steel sub pricing for task orders.
Research DataBank's GC selection for Red Oak campus. Three data centers = multiple steel packages. Reach out to DataBank's construction/procurement team and monitor for GC announcements. Dallas is a target metro.
Review the April 24 Planning Commission agenda for specific project items — look for conditional use permits, development agreements, or environmental review for multi-story commercial, healthcare, mixed-use, or institutional projects. San Francisco is ConXtech's home market and highest-priority metro. Flag any 2-6 story new construction projects for follow-up.
Review solicitation to determine if ConXtech qualifies as small business or if partnering with a small business prime is viable. Identify the contracting agency and geographic scope. If SoCal/AZ focus, may overlap with the other MACC solicitation — coordinate strategy.
Research GC selection for this $700M resort project — if no steel sub is locked, ConXtech could compete for structural steel packages. Galveston is low-seismic so proprietary system's seismic advantage is less relevant, but speed-to-market and schedule certainty on a large hospitality project could be compelling. Determine if resort includes mid-rise hotel buildings (2-6 stories) that fit the system.
Unknown — Palomar Health campus project scope unclear from utility permits alone
planning
No GC
Palomar Medical Center Escondido — utility tank permits may signal larger campus work. San Diego is a target metro. Research Palomar Health's capital plan and check City of Escondido planning records for associated building permits.
Steel is complete on this project — no current opportunity. However, McCarthy Building Companies (★ Known Partner) delivered this $150M university research facility. Use this as a relationship touchpoint: contact McCarthy's project team to discuss future CSU or DOE-funded lab/research facility phases. Marvel Fusion partnership and DOE involvement suggest follow-on phases may be planned. Track Colorado State University capital plan for similar projects.
Monitor this mega-project — $1.4B pharma manufacturing campus will have massive steel needs across multiple phases. Not in a target metro but the scale warrants tracking. Identify design team and CM selection timeline. Look for early-phase buildings that could be bid in 2026. AbbVie is a confidential life science/pharma client type.
Monitor — $550M data center has cleared state-level hurdle but Jay, ME is not a target metro and brownfield sites add timeline risk. Track for GC selection; if a known partner wins the GC role, revisit.
Kaiser Fremont campus utility infrastructure is under construction — minimal steel scope in current phase but monitor for future building additions. Confirm with Kaiser Facilities Planning whether building expansions are planned at this campus.
The San Pedro project is already under construction — low chance to capture. However, use this as market intelligence: LA multifamily starts are surging. Identify other mid-rise (2-6 story) steel-frame multifamily projects in LA pipeline that haven't broken ground. Cross-reference with known GC partners (MATT Construction, C.W. Driver, Bernards) for upcoming LA multifamily bids.
Unknown — LRSO is a major DoD program, facility could be $20M–$100M+
bidding
No GC
Download full solicitation from SAM.gov to determine facility size, location, structural scope, and whether steel subcontracting is part of the package. LRSO (Long Range Standoff) is a nuclear weapons program — facility may require specialized construction. If located in a target metro and involves multi-story steel structure, escalate to BD team.
Current scope is primarily campus infrastructure (tanks, connectors, canopies) — largely under construction. Research the GC on this project. Monitor Sharp Healthcare system for future building projects — Sharp is one of San Diego's largest health systems and will have ongoing capital needs. The Campus Connectors could have some structural steel but are likely small scope.
3-story O.B. Addition is a good fit for the proprietary system but is under construction. Research the GC — if it's a ConXtech partner, there may still be an opening for the steel package or future phases. Check if steel erection has begun.
VA EHRM infrastructure upgrades at Waco VAMC — deadline is May 4 (3 days). Likely too late to bid as prime. Check if any known partner GCs (Hensel Phelps, McCarthy, Jacobs) are bidding as prime and offer steel sub pricing. EHRM upgrades typically involve significant interior infrastructure but may include structural modifications.
VA EHRM infrastructure upgrades at Syracuse VAMC — due May 20. Syracuse is outside primary target metros but within Northeast conventional steel range. Identify which GC primes are pursuing this (Turner, Whiting-Turner, Suffolk are known partners active in Northeast). Offer conventional steel subcontractor pricing for structural scope.
Review the SF Planning Commission agenda for 5/6/2026 (hearing #306) to identify specific projects under review. Flag any mid-rise commercial, healthcare, education, or mixed-use items for deeper research. SF is ConXtech's home market — any new multi-story development here is worth tracking.
3-story hospital addition under construction — steel likely already awarded. Research the GC to build relationship for future projects. Check if there are additional phases planned for this campus.
This is a military maintenance facility in PA — conventional steel fit. Review solicitation on SAM.gov for steel scope and subcontracting opportunities. Due 2026-05-28 — act immediately. Identify prime GC bidders and offer structural steel package.
Hangar construction is steel-intensive. Review SAM.gov solicitation for structural steel scope and set-aside requirements. Two hangars could represent meaningful steel tonnage. Identify prime GC bidders in the NYC area and offer conventional steel package.
Research Iren's Sweetwater campus phasing — 2GW campus implies multiple buildings over years. Identify GC for future phases and determine if data center structures involve steel frame. Sweetwater is not a target metro but TX is a growth region for ConXtech.
Determine if this is a NAVFAC IDIQ — NAVFAC is a known prefab-friendly owner. If so, identify which GCs are likely to bid (check for Hensel Phelps, McCarthy, Sundt, RQ Construction). Position ConXtech as structural steel sub on future task orders. Track full solicitation release on SAM.gov.
NAVFAC is a known prefab-friendly owner. Boston is a target metro. Download the full solicitation to assess structural scope and whether steel frame is specified. Identify which GCs are likely to bid — reach out to Suffolk Construction, Turner, and Hensel Phelps who are known partners and active in the Boston market.
Hangar projects are heavily steel-dependent. Tucson is not a core metro, but scope could be significant. Download solicitation to assess steel tonnage and whether ConXtech's partner fab shops can serve this region. Identify bidding GCs — Hensel Phelps and Sundt frequently bid AZ military work.
Type C construction designation suggests wood-frame over podium, which would significantly reduce steel scope. Research whether this project has a steel podium or is entirely wood-frame. If steel podium exists, contact Journeyman Construction about structural steel package. Austin is a target metro but this is likely a wood-frame multifamily project.
Attend Industry Day (due June 1) to gather project details — TRACON facilities are typically steel-framed, 1-2 story structures with significant structural requirements. Identify which GCs are attending and align with known partners (Turner, Hensel Phelps) who may pursue.
NAVFAC is a known prefab-friendly owner. This is a large industrial facility likely requiring significant structural steel. Cherry Point is outside target metros but NAVFAC relationship is valuable. Review solicitation for structural steel scope and identify which GCs are bidding — Hensel Phelps and Jacobs are known ConXtech partners active in military construction.
Large design-build federal project through USACE Sacramento District (SPK). Watch for full solicitation. Identify DB teams likely to pursue — Hensel Phelps, Jacobs, and Mortenson are ConXtech partners active in DB federal work. Utah is moderate seismic zone. Position ConXtech for structural steel package to the winning DB team.
Two new K-12 schools with $224M bond approval in Connecticut — conventional steel fit. Monitor for architect selection and GC procurement. Connecticut is within ConXtech's Northeast conventional steel target region. Track the district's procurement timeline and identify the design team once selected.
Blackstone is deploying massive capital into data centers — monitor for specific greenfield construction projects in Austin, Phoenix, and other target metros. Track BXDC portfolio announcements for new builds vs. acquisitions. Identify Blackstone's preferred GC partners for data center construction.
Multi-billion (aggregate Texas data center pipeline)
under_construction
No GC
Multiple hyperscale data center projects in Austin and broader Texas. Skybox PowerCampus is under construction (may be too late). Monitor OpenAI, Oracle, Meta, CoreWeave for new phase announcements in Austin area. Research GC relationships on active Texas data center projects to find entry points.
5-story hotel in Austin fits proprietary system profile (2-6 stories, hospitality, ~80K sqft). GC appears to be owner-builder. Research Deffenbaugh Building Co — reach out to inquire about structural steel package status and whether steel has been awarded.
DHA IDIQ for healthcare design-build construction. Check if due date has passed. If still open, ConXtech should partner with a GC prime (Hensel Phelps, Turner, McCarthy — all known partners with federal healthcare experience) to be included as structural steel sub on their IDIQ proposal. Even if closed, track task order releases under this contract.
Research developer/owner. The Type IA podium is the steel scope — likely a 1-story steel podium supporting 5 wood-frame levels. Assess whether podium scope justifies ConXtech engagement. If podium is large enough (395 units = significant footprint), conventional steel bid could work. Track CalOSHA permit status.
Design-bid-build barracks in MA — conventional steel fit for Northeast operations. Barracks are often 2-4 story steel/CMU construction. Download solicitation documents to confirm structural system and scope. Identify GCs likely to bid (check if Suffolk Construction or other known partners pursue military work in NE). Respond or partner with a GC bidder by June 18 deadline.
Google is a known prefab-friendly owner. Monitor for site selections in target metros (Bay Area, Sacramento, Las Vegas, Portland). Contact Google Real Estate / Blackstone RE development team to understand facility locations and structural procurement path. Track for individual project announcements that could yield $5M-$20M steel packages.
Google is a known prefab-friendly owner. New Florence, MO is outside core geographies, but $15B campus will be phased over years with enormous steel scope. Track for GC selection — if DPR, Mortenson, or another known partner wins packages, ConXtech could pursue steel scopes. Monitor Google's procurement process and phase timelines.
Active federal solicitation due 6/15. Hangar is large-span steel — conventional steel fit. Tucson is outside core metros but Arizona is reachable. Review full solicitation on SAM.gov for set-aside type, steel scope, and GC bidders. If open to steel sub-bids, ConXtech could pursue conventional steel package through partner fab shops. Identify prime GC bidders — check if Sundt, Hensel Phelps, or other known partners are pursuing.
$50M-$150M (new federal facility with specialized systems)
bidding
No GC
New construction federal facility in Westbury, NY — target metro. This is an Industry Day / Sources Sought, meaning GC teams are forming now. Identify which known GC partners (Turner, Suffolk, Whiting-Turner) may attend Industry Day. Conventional steel opportunity for Northeast team. Register for Industry Day to gather project details.
New maintenance facility in New Castle, PA — Pittsburgh metro, target region for conventional steel. 1-2 story steel frame maintenance building is a solid conventional fit. Review solicitation to determine if ConXtech can bid steel subcontract. Identify GCs bidding the prime contract — check if Whiting-Turner or other known partners are pursuing.
Monitor for future phases and support buildings (office, operations centers) that could be 2-6 stories. Research who the GC is — major hyperscale projects often use Mortenson, DPR, or Hensel Phelps. Abilene is not a target metro but $15B campus will have ancillary structures.
Use this as a market signal to prioritize NYC conventional steel prospecting. Pull REBNY Q1 2026 permit data to identify 1-2 story commercial/office new builds in Manhattan and boroughs. Focus on projects with Suffolk Construction or Turner Construction as GC. ConXtech conventional steel team should increase NYC BD activity.
Multiple — Chicago, Arlington VA, and coastal markets
hd residential
$4.4B under construction (combined pipeline)
under_construction
Unknown
Strategic relationship opportunity. AvalonBay and Equity Residential are among the largest multifamily developers in the US with heavy West Coast and Northeast portfolios. Research their upcoming pipeline in CA (Bay Area, LA) and target metros. Identify specific projects in planning/permitting. Both use steel-framed podium construction for mid-rise — strong ConXtech proprietary fit.
Track this project — San Jose is a prime ConXtech metro. Determine if this is a new build or a tenant improvement of existing space. If new construction, a robotics demonstration center could be 1-3 stories with mezzanine levels and clear-span requirements — good fit for ConXtech steel. Check San Jose planning/permit filings for Kawasaki applications.
NAVFAC is a known prefab-friendly owner and Philadelphia is a target metro for conventional steel. Review the presolicitation for MACC scope and capacity requirements. ConXtech should evaluate partnering with a GC pursuing this IDIQ to be positioned for steel task orders. Monitor SAM.gov for full solicitation release by 2026-06-10.
$200M (Terminal B program); $3.5B (AirTrain — infrastructure, likely disqualified)
permitted
Tutor Perini / O&G Industries (AirTrain); TBD (Terminal B)
The AirTrain is infrastructure (disqualified), but the Terminal B $200M modernization may include structural steel packages suited for conventional scope. Monitor procurement for Terminal B trade packages. Identify if any known GC partners (Turner, Suffolk) are pursuing the terminal work.
Download solicitation package from SAM.gov to determine project scope, steel tonnage, and whether this is new construction or renovation. 'Minor Construction' designation and remote location (Big Spring) suggest smaller scale — verify steel scope meets $1.5M minimum before pursuing. If viable, identify GC bidders and offer structural steel subcontract.
Submit a capabilities statement in response to the Sources Sought notice by June 2 deadline. Moffett ANGB is in Mountain View, CA — high seismic zone, ideal for ConX proprietary system. Simulator facilities are typically 1-2 story with clear spans and high bays. Flag for known GC partners with federal/DoD experience (Hensel Phelps, Jacobs, Sundt) who may bid the eventual RFP. Track SAM.gov for full solicitation release.
Download full solicitation from SAM.gov to determine structural system, building size, and steel scope. Child Development Centers are typically 1-2 story, 15K-30K sqft — conventional steel fit for East Coast. Fort Hamilton is in Brooklyn (target metro). Identify GC bidders and offer conventional steel subcontract. Check if Turner, Suffolk, or other known partners are pursuing.
Steel likely already awarded. Monitor Gilbane relationship for future TerraPower/life science phases. Track for potential Phase 2 or fit-out structural work. Gilbane is not a current ConXtech partner — use as introduction opportunity.
Turner is a ★ Known Partner. These are megaprojects likely over 6 stories equivalent and heavy industrial — not ideal for proprietary system. However, contact Turner's data center division to understand if any sub-buildings (admin, support, smaller data halls) fit ConXtech conventional steel scope. The $6B Lancaster PA project is in target region. Also note Mortenson (★ Known Partner) is teaming with Turner on the Meta project.
Small SB 1953 compliance scope — canopies and utility infrastructure. Steel scope likely below threshold. Monitor only for potential larger building phases.
Review full RFP on SAM.gov. This is a military industrial facility in PA — conventional steel fit. Identify which GCs are likely primes (Hensel Phelps, Jacobs are known partners with federal work). Reach out to prime bidders to offer structural steel subcontract.
Review full RFP on SAM.gov — due July 8. Large-span distribution facility likely has significant structural steel scope. Coordinate with the RMMF solicitation (same depot). Identify prime GC bidders — Hensel Phelps, Jacobs are known partners with federal experience.
Monitor SAM.gov for full solicitation release — presolicitation due July 7. 'Large Asset Integration Facility' suggests high-bay industrial with significant steel. Determine location and identify likely prime contractors. If located in target metro, escalate priority.
Two-story data center is a fit for ConXtech system. Corsicana is near DFW. Research Riot Platforms' existing GC relationships on the Corsicana campus — check who built earlier phases. Reach out to Riot Platforms' construction/facilities team about structural steel for the new building.
NJ target region. Mission Training Center likely 1-story steel structure — conventional fit. Review solicitation for structural scope and small business set-aside requirements. Due 7/7 — identify GC bidders pursuing this work. Egg Harbor Township is southern NJ so verify accessibility from ConXtech's NE fab partners.
Monitor bond vote in November 2026. If passed, projects would likely award in 2027-2028 — too early for current sprint but valuable pipeline. Hillsboro OR is Portland metro (target region) in high-seismic zone — proprietary system is ideal for K-12 gymnasium additions and school replacements. Engage Hillsboro SD facilities team after bond passage. Fortis Construction and Bouten Construction (★ Known Partners) are active in Portland-area education.
Monitor this project for progression to design/permitting. San Antonio is adjacent to Austin target metro. Research Legacy Investing's development team and preferred GCs. Data centers have repetitive steel framing that fits ConXtech systems.
★ Turner Construction and Consigli Construction (JV)
Turner is a ★ Known Partner. However, this is likely a high-rise (883K sqft cancer center with 208 beds, 12 ORs) which disqualifies the proprietary system. Project is already under construction with steel erection mid-2027 — steel subcontractor likely already selected. Monitor for any supplemental steel packages or future MSK campus projects. Contact Turner NYC office to stay on radar for future healthcare work.
$50M-$200M (federal courthouse — wide range without details)
planning
No GC
Pre-solicitation posted with 6/16 deadline — review full notice on SAM.gov immediately for scope details. Federal courthouses are typically steel-framed. Rochester is in the NE conventional steel target zone. If within 1-6 stories, ConXtech conventional steel could be competitive. Identify which GCs will pursue as prime and position as steel sub.
McCarthy is a ★ Known Partner. Project is already under construction so this specific opportunity is likely past. However, use this as a touchpoint with McCarthy's Phoenix office — ask about upcoming education projects in the pipeline. Phoenix is outside core target metros but McCarthy relationship makes it worth tracking.
Research GC and structural steel subcontractor for AT&T campus. Given 2028 delivery, primary structural steel is likely procured. Investigate whether later-phase buildings, parking structures, or ancillary amenity buildings still need steel packages. Samsung HQ relocation may also trigger a separate build-out — monitor for new construction announcements.
Massive data center campus expansion but in rural Virginia — not a target metro and not in a high-seismic zone. Monitor for GC selection. If a known partner GC wins the work, there may be an opportunity for conventional steel packages. Research Microsoft's construction management firms for this region (typically Holder, Fortis, or DPR for data centers).
NAVFAC is a known prefab-friendly owner — ConXtech has an existing relationship. Design-build laboratory at NMIC. This is a federal design-build so ConXtech would need to partner with a design-build GC prime. Research which firms are bidding as prime (likely Hensel Phelps, Clark, Gilbane, or similar). Contact NAVFAC procurement for bidder list if available. Due July 15.
Pittsburgh (New Castle is ~60 miles NW of Pittsburgh)
government
$10M-$25M
bidding
No GC
Military maintenance facility in PA — fits conventional steel profile (1-2 story, steel and joists). Very tight deadline (June 11). Research which GCs are bidding as prime. If scope is $1.5M+ in steel, this is actionable for conventional steel East Coast work. Contact SAM.gov for plan holders list immediately.
Review solicitation on SAM.gov — due 6/18 (urgent). Barracks are typically 2-4 story steel frame with repetitive bay spacing. Conventional steel fit in target NE region. Identify GCs pursuing this and offer conventional steel subcontract. Check if Turner, Suffolk, or another known partner is bidding.
AWS Gilroy data center — high-seismic CA location near San Jose metro. Research permitting status and whether GC has been selected. ConXtech's speed advantage could help AWS recover lost schedule from 24-month delay — strong selling point. Reach out to AWS data center construction team or monitor for GC solicitation.
Monitor for GC selection — $700M resort will have major structural steel components. Galveston is near Houston target metro. Research whether hotel buildings are mid-rise steel frame (ConXtech proprietary fit for 2-6 story hotel buildings). 'Beach Cottages' component likely wood frame — focus on main resort structures. Contact RREAF Holdings development team to understand structural system and timeline.
$830M (entire Lake View East development — ~17+ buildings)
permitted
Harvey Cleary Builders
This is the largest individual residential building (~99K sqft, 6 stories) in the Lake View East development. Research whether structural system is steel frame vs. wood-over-podium. If steel, contact Harvey Cleary Builders about structural steel subcontractor selection — ConXtech proprietary system could accelerate schedule across multiple repetitive buildings. Emphasize multi-building efficiency.
Part of Lake View East — 6-story mixed-use residential. Pursue as package deal with other modules. Contact Harvey Cleary Builders to determine structural system and bid timeline for steel package across all 6-story residential buildings.
Part of Lake View East multi-building development. Same approach — contact Harvey Cleary Builders to inquire about structural steel scope across the entire development. Propose ConXtech system for repetitive mid-rise buildings to compress overall schedule.
Lake View East Module N (5 stories, ~36.6K sqft) — slightly under sqft threshold for proprietary but viable if bundled with other modules. Pursue as package.
$830M (entire Lake View East development across all modules)
permitted
Harvey Cleary Builders
This 6-story mixed-use module is the best individual fit for ConXtech's proprietary system within this massive development. However, the real opportunity is the ENTIRE development — 12+ buildings, multiple 5-6 story structures. Contact Harvey Cleary Builders to understand structural system decisions across all modules. Position ConXtech for the 5-6 story residential buildings collectively. Note: Harvey Cleary is NOT a known ConXtech partner — this is a new relationship opportunity.
5-story mixed-use multifamily — fits proprietary system profile. Pursue as part of aggregate approach across the entire Bridge Point development. Contact Harvey Cleary Builders to determine if structural steel is the chosen system for the 5-story modules.
$830M (entire development); individual building est. $40M–$60M
permitted
Harvey Cleary Builders
This is the strongest individual building in the 6915 Bridge Point Pkwy master development — 6 stories, ~99K sqft mixed-use with parking garage. Research Harvey Cleary Builders' steel subcontractor relationships. Austin multifamily often uses concrete podium + wood frame, but at 6 stories with garage this could be steel. Contact Harvey Cleary to determine structural system and whether steel packages are being bid. If steel, pitch ConXtech proprietary system for schedule advantages across the repetitive multi-building program.
$830M (entire development); individual building est. $15M–$25M
permitted
Harvey Cleary Builders
2-story athletic center/spa at ~54K sqft is a good fit for conventional steel. Long-span spaces for athletic facilities likely require steel framing. Contact Harvey Cleary Builders to determine if structural steel package is being bid separately. Bundle pitch with other buildings in this development for program-level pricing advantage.
$830M (entire development); individual building est. $15M–$25M
permitted
Harvey Cleary Builders
5-story mixed-use multifamily — within ConXtech proprietary system sweet spot (2-6 stories). At ~37K sqft it's slightly under the 50K threshold for proprietary but the multi-building program context makes it worthwhile. Pursue as part of a bundled approach with Module W (Bldg 9) and Module G (Bldg 10).
$830M (entire development); individual building est. $15M–$25M
permitted
Harvey Cleary Builders
5-story mixed-use multifamily — similar profile to Module H (Bldg 11). Bundle with other mid-rise buildings in the program. Contact Harvey Cleary Builders to inquire about structural system selection and whether steel packages are being competitively bid.
Review SAM.gov solicitation for full scope and NAICS. If structural steel is a standalone package, submit qualifications. PA is a conventional steel target region — check if scope meets $1.5M minimum. Due June 16 — act immediately.
The real lead here is the TerraPower $450M cancer drug manufacturing facility at Bellwether District in South Philadelphia (250K SF). Research this project separately — identify architect and developer. A pharmaceutical manufacturing facility of this scale likely requires structural steel, mezzanines, and potentially cleanroom support structures. ConXtech conventional steel team in the Northeast should track this. Contact Bellwether District development team to understand procurement timeline.