San Diego City College Performing Arts Project Enters Schematic Design Phase

📍 San Diego SoCal
5/10
Action Required
★ Sundt Construction is a known ConXtech partner and is the design-build GC. Contact Sundt's San Diego office about the structural steel package for this performing arts facility. At 28K sqft, steel scope may be below $1.5M threshold — confirm scope size. Part of $3.5B bond program — identify other projects in the Measure HH pipeline that may be larger.
ConXtech System
🟢 Proprietary System
Project Type
education
Project Stage
Planning
Stories
Estimated Size
28,000 sqft
Total Project Value
$35M–$55M
Estimated Steel Scope
$800K–$1.5M
Timeline Fit
Schematic design phase — construction likely 12-18 months out. Award possibly late 2026 or 2027. Moderate timeline fit for tracking.
Fit Assessment
possible fit
General Contractor
★ Sundt Construction
Owner
San Diego Community College District
Key Contacts
[object Object]
[object Object]
[object Object]
Lead Status
Team Notes