← Back to Dashboard

UCLA: 901 Levering Student Housing

📍 Los Angeles SoCal
8/10
Action Required
UCLA is a UC system owner — known prefab-friendly. $351M student housing project in design. Research architect and structural engineer of record. Contact UCLA Capital Programs to understand GC procurement timeline. If steel-framed (vs. concrete podium + wood), this is a major opportunity. ConXtech's proprietary system ideal for repetitive bay spacing in student housing. Note: may be concrete or hybrid — verify structural system early.
Why This Matters

A $351M student housing project for UC — a known prefab-friendly owner. Student housing has repetitive floor plans ideal for ConXtech's proprietary system. Currently in design with construction starting March 2027, giving ConXtech time to engage and influence the structural system choice. The question is whether it will be steel-framed or concrete.

ConXtech System
🟢 Proprietary System
Project Type
hd residential
Project Stage
Planning
Stories
Estimated Size
200,000-400,000 sqft
Total Project Value
$351M
Estimated Steel Scope
$5M-$15M
Timeline Fit
Design phase now, construction start March 2027. Steel award likely late 2026 or Q1 2027. Slightly later than ideal but within window.
Fit Assessment
strong fit
General Contractor
No GC Selected
Owner
University of California, Los Angeles Prefab-Friendly
Key Contacts
[object Object]
Lead Status
Team Notes